83c

Lump Rescreening Facilities at Robe River Cape Lambert Port Site, WA. 
Detailed design by Proteus

Tetra Tech Proteus has been engaged by most major (and many smaller) Australian mining companies to undertake a wide range of study, design, EPCM and
EPC projects. A selection is provided below. We have particular experience in:

  • materials handling systems for a wide range of commodities
  • dust and emissions control systems.
  • underground crushing
  • mine fill plants
  • underground services including mine ventilation and refrigeration systems
  • water supply and mine de-watering systems

 

Koumbia Project
Client: Alliance Mining Commodities

Capital: $880m
Proteus role: DFS (
EPCM Pending)

Koolyanobbing 8.0mtpa Expansion
Client: Portman Mining Limited

Capital: $25m
Proteus role:
FEED and EPCM

Marandoo Crushing and Screening
Client: Clough/Rio Tinto Iron Ore
Capital: $35m
Proteus role:
Detailed design for Clough

Residue Disposal Facilities
Client: BGMMCo (Newmont)
Capital: $90m
Proteus role:
FEED and EPCM

Ravensthorpe Limestone Plant
Client: Ravensthorpe Joint Venture
Capital: $15m
Proteus role:
Detailed design

Ultra Fine Grinding Plant
Client: KCGM
Capital: $6.5m
Proteus role:
FEED and EPCM

St Ives Mining and Milling Projects (various-2002-2007)
Client: Goldfields Australia Ltd
Capital: $0.5m - $3.0m
Proteus role:
EPCM's (Underground infrastructure, dewatering, paste plants, ventilation, services (HV/LV, power, process water, etc)

Argyle Expansion Surface works
Client: Rio Tinto
Capital: $10m (circa)
Proteus role:
Detailed design and Construction Support

Geraldton Port Upgrade - Conveyor System
Client: Geraldton Port Authority
Capital: $12m (circa)
Proteus role:
Detailed design

Argyle Fine Tailings System
Client: Rio Tinto
Capital: $1.5m
Proteus role:
FEED and EPCM

Lump Rescreening Facility
Client: Robe River Mining Co
Capital: $10m
Proteus role:
FEED, Detailed Engineering and Procurement (part)